Youngstown & The Mahoning Valley => West Side Youngstown => Topic started by: jay on December 06, 2019, 03:34:58 PM

Title: New Sidewalk For South Belle Vista
Post by: jay on December 06, 2019, 03:34:58 PM
Some underground pipes are being installed along the west side of South Belle Vista.  As a result, all the sidewalks along Calvary Cemetery have been torn out and will be replaced when the project in completed.
Title: Re: New Sidewalk For South Belle Vista
Post by: jay on March 17, 2020, 07:16:01 PM
The forms have been installed.  All we need is for the concrete to be poured.

Holes have been dug in the sidewalk along the north end of the cemetery.  They appear to be boring a hole and pulling large plastic pipe through it. 

Traffic is restricted to only one lane.
Title: Re: New Sidewalk For South Belle Vista
Post by: jay on May 26, 2020, 01:02:41 PM
Work has started again on this pipe line project.  Traffic is down to one lane today.
Title: Re: New Sidewalk For South Belle Vista
Post by: Why?Town on May 28, 2020, 01:32:43 PM
Quote from: jay on May 26, 2020, 01:02:41 PM
Work has started again on this pipe line project.  Traffic is down to one lane today.

I'll have to sadly admit that sometimes a little bad news is required to get to the good news.