Some underground pipes are being installed along the west side of South Belle Vista. As a result, all the sidewalks along Calvary Cemetery have been torn out and will be replaced when the project in completed.
The forms have been installed. All we need is for the concrete to be poured.
Holes have been dug in the sidewalk along the north end of the cemetery. They appear to be boring a hole and pulling large plastic pipe through it.
Traffic is restricted to only one lane.
Work has started again on this pipe line project. Traffic is down to one lane today.
Quote from: jay on May 26, 2020, 01:02:41 PM
Work has started again on this pipe line project. Traffic is down to one lane today.
I'll have to sadly admit that sometimes a little bad news is required to get to the good news.