Philip Murray Bridge between South Side and the Bluff reopens all lanesTraffic restrictions are over for the winter months on the Philip Murray Bridge but work on a $20 million project will resume next year.Traffic restrictions are over for the winter months on the Philip Murray Bridge but work on a $20 million project will resume next year.
Source: Philip Murray Bridge between South Side and the Bluff reopens all lanes (http://www.post-gazette.com/news/transportation/2018/11/26/Philip-Murray-Bridge-south-side-10th-street-bridge-pittsburgh-construction-Bluff-pgh-Monongahela-River/stories/201811260131)